Current Projects
- No categories
Softline Offices, Century Gates
This project is situated in century City, Centure Gates Precinct. Completion date is scheduled for March 2011.
Marine Park, Paarden Eiland
MARINE PARK has been granted a C4 General Commercial Zoning and will consist of a mixture of modern offices and prominently situated showrooms with warehousing.
MARINE PARK which is set well back from Marine Drive, will have a landscaped forecourt and provide in access of 100 parking bays. Using the existing buildings it will have a new , modern and architecturally up-to-date façade, giving it the modern character of a prime office node.
Offices and Showrooms will be equipped to modern standards with up-market finishes.
Floorplans show a great flexibility to suit the needs of a mixture of Tenants.
OBZ Square, Student residence
OBZ Square student residence for UCT, Observatory Main Road, Cape Town.
- provides accommodation for 880 students in rooms of 11,5 square meters, each with an en suite shower and WC.
- each group of a maximum of 11 rooms is serviced by a kitchen, adjacent to the group of rooms.
- the design has resulted in a building located along the external perimeter of the site which forms the largest possible internal open courtyard which in turn is split into two similar rectangles with a central “bridge” of accommodation.
- the open landscaped internal courtyards are located at the lowest level of rooms at first floor which makes them easily accessible by all residents of the building via a large central social space located between the two courtyards.
- The ground floor offers a range of additional management and study facilities such as a computer room, study rooms, meeting and interview rooms and offices for residence management. This foyer space has natural light and ventilation via a small but important landscaped atrium that opens into one of the internal courtyards above.
- The Main Road edge of the development is brought to life by the building being set back five meters from the street boundary offering a wide, safe and useable landscaped pavement zone with shops on both sides of the entrance to the residence.
- The site footprint has been maximized for development other than along the William Street edge where the intention is to provide a more pleasant landscaped environment to what is a narrow and predominantly residential street.
Parklands College, Sandown
This project is under construction. Completion date is schduled for August 2011, with the school to start operating in January 2012.